204 completed crossings

MICROTUNNELLING · DUBAI
Engineering
below the surface.
Oğuzhan Ataşalar — Microtunnelling Project Manager delivering complex, large-diameter underground infrastructure across the Middle East.
experience
delivered
internal diameter
crossings
70,532 metres.
Built below ground.
A cumulative microtunnelling record across two major Middle East markets, delivered through hundreds of individual crossings.
174 completed crossings
378 completed crossings
Precision underground.
Leadership above it.

Microtunnelling · NDRC · Dubai
Civil Engineer and Microtunnelling Project Manager with 12+ years of experience in NDRC, pipe jacking and trenchless infrastructure projects across the UAE, Saudi Arabia and Türkiye.
I have been involved in more than 70,000 metres of tunnelling works, with tunnel diameters ranging from 600 mm to 3,500 mm ID, including deep shafts, long-distance drives, high-groundwater conditions, complex utility crossings and large-diameter microtunnelling operations.
My expertise covers AVN/Herrenknecht microtunnelling systems, slurry separation plants, pipe jacking operations, shaft preparation, alignment control, settlement-risk management, site coordination and technical problem-solving under challenging ground conditions.
I am passionate about delivering safe, efficient and high-quality underground infrastructure projects with minimum surface disruption, especially in dense urban environments such as Dubai.
Infrastructure
that moves cities.
Technical control from the first borehole review to final breakthrough.

695 metres.
One decisive drive.
A landmark large-diameter microtunnel delivered beneath one of Dubai's most critical and heavily trafficked transport corridors.
Landmark large-diameter crossing beneath one of Dubai’s most critical transport corridors.
View project details →
Explore the full project portfolio.
All Dubai and Saudi Arabia projects are listed in one structured project database.
View all projects →Field knowledge.
Clearly documented.
Technical notes and direct answers on microtunnelling, pipe jacking and NDRC delivery.
“Every successful breakthrough begins long before the cutterhead starts turning.”
Plan the ground. Control the risk. Lead the team.
Engineering progress,
seen from the field.
A site visit with senior Dubai Municipality leadership during underground infrastructure works in Dubai.